2.7 Georgia Milling Assessment
Georgia Milling Assessment
All main milling listed below were constructed during the Soviet time. Specifications and requirement of these mills were according to ex-Soviet standards. All mills have railway sidings for delivery of wheat grain from the port. Most of them are partly operational. due to old age of milling machinery, low demand and uncompetitive milling cost compared to newly constructed small capacity mills these factories never reach their maximum milling capacities
Location | Mill | Distance from Tbilisi | Milling (mt/day) | Grain Storage (mt) | Blending | Fortifying |
---|---|---|---|---|---|---|
Poti | Poti Mill | 350 | 200 | 30,000 | N | No |
Zugdidi | Zugdidi | 300 | 150 | 20,000 | N | No |
Kutaisi | Kutaisi | 250 | 150 | 20,000 | N | No |
Kachreti | Kachreti | 90 | 150 | 20,000 | N | No |
Tbilisi | Didube Mill | 10 | 200 | 30,000 | N | No |
Rustavi | Progress | 25 | 150 | 25,000 | N | No |
Tsnori | Tsnori mill | 150 | 150 | 20,000 | N | No |
Milling Company: Alaphi
Company Name & Address |
Contact Names & Email |
Telephone & Fax |
---|---|---|
Alaphi, Gardabani
|
Name: Emzar Lomidze Title: Deputy Director Email: n/a Web: n/a |
Tel: +995 99 174 736 Fax: +995 99 174 736 |
Summary of Role and Services: n/a |
Facilities |
||||
---|---|---|---|---|
Parking area inside compound m² |
3,000 |
|||
Drainage (Good / Fair / Poor / Non Existent) |
Good | |||
Fire Fighting Equipment (Yes / No) |
Yes | |||
Number of Ventilators |
6 Screened |
|
||
Electricity Load (KVA) |
500 |
|||
Backup Generator (Yes / No / KVA) |
Yes |
KVA - 100 |
Milling Equipment |
|||
---|---|---|---|
Origin of Machinery |
Year of Mfg |
Year of Installation |
Condition |
Muller | 1996 | 1996 | Perfect |
Maintenance |
|||
---|---|---|---|
Duration (hours / week) |
3 days |
Type of maintenance |
n/a |
Other Equipment or Machinery Installed |
||||
---|---|---|---|---|
Type of Equipment |
Yes/No |
Number |
Owned |
Comments |
Fortification Feeder |
Yes |
1 |
Yes |
n/a |
Bag Cleaning Plant |
n/a |
n/a |
n/a |
n/a |
Moisture Tester |
Yes |
4 |
Yes |
n/a |
De-stoning Plant |
n/a |
n/a |
n/a |
n/a |
Metal Extractor |
n/a |
n/a |
n/a |
n/a |
Staffing |
|
---|---|
Number of full time skilled workers |
62 |
Number of full time labourers |
62 |
Weighbridge |
||||
---|---|---|---|---|
Number |
n/a |
Capacity (mt) |
Length (m) |
Type |
Within Compound |
60 |
15 |
manual |
Building |
|||
---|---|---|---|
|
Length (m) |
Width (m) |
Height (m) |
Building – Wheat Mill |
n/a |
n/a |
n/a |
Building – Maize Mill |
50 |
12 |
16 |
Walls |
Brick | ||
Roof |
Metal | ||
Floor |
Concrete |
Conditions & Cleanliness |
||
---|---|---|
|
Outside |
Inside |
Cracks in walls or roof (Yes / No) |
n/a |
n/a |
Signs of rodent activity (Yes / No) |
n/a | n/a |
Signs of birds entry (Yes / No) |
n/a | n/a |
Damaged gutters/drains(Yes / No) |
n/a | n/a |
Signs of moisture (Yes / No) |
n/a |
n/a |
Adjacent Vegetation(Yes / No) |
No |
No |
Cleanliness (Good / Poor) |
Fair |
Fair |
Pest Control |
|||||
---|---|---|---|---|---|
Fumigation |
Done |
Frequency | n/a |
Contracted (Yes / No) |
n/a |
Spraying |
Done |
Frequency | n/a |
Contracted (Yes / No) |
n/a |
Rodenticides |
Done |
Frequency | n/a |
Contracted (Yes / No) |
n/a |
Rodent Trapping |
Done |
Frequency | n/a |
Contracted (Yes / No) |
n/a |
Security |
||
---|---|---|
Security (Good / Poor) |
Good | |
Compound (Fenced / Not Fenced) |
Fenced | |
Other Comments | n/a |
Access |
||||||
---|---|---|---|---|---|---|
Distance from main town (km) |
10 Km |
|||||
Travel time if not located in town (hours) |
n/a | |||||
Road condition to Mill |
Good | |||||
Road limitation (if any) Maximum Width and Max. Tonnage |
n/a |
|||||
Rail connections (Yes / No) |
n/a |
|||||
On the railway from |
n/a |
to |
n/a |
|||
Other Comments |
Storage Capacity |
||
---|---|---|
Storage in Metric Tonnes |
Wheat – Covered (mt) |
Flour – Covered (mt) |
Within the Compound |
6,800 mt |
n/a |
Outside the Compound |
n/a |
n/a |
Loading & Discharge Rates |
---|
Truck load rate: 30 mt per hour & Truck discharge rate: 50 mt per hour |
Transport Capacity at Mill |
---|
No information provided. |
For information on Georgia Milling Company Contact details, please see the following link: