Start here
User Guides
...
For more information on milling company contact details, please see the following link: 4.6 Storage and Milling Companies Contact List.
Company Name and Address | Contact Names and Email | Telephone and Fax |
---|---|---|
Pride Milling Stasie Street, Leslie, Leandra Mpumalanga, South Africa, 2265 |
Name:
Title:
Email:
Web:
Tel: 017 683 0050 Fax: | ||
Summary of Role and Services | ||
---|---|---|
|
Facilities
Parking Area Inside Compound (m²)
Drainage
Good / Fair / Poor / Non Existent
Fire Fighting Equipment
Number of Ventilators (screened)
Backup Generator(s)
Yes / No
List capacity of each backup generator in KVA
Milling Equipment
Origin of Machinery
Year of Mfg
Year of Installation
Condition
Maintenance
Duration
Hours / Week
Type of Maintenance
Other Equipment or Machinery Installed | |
---|---|
Type of Equipment | Available |
Number
Owned
Comments
Fortification Feeder | Yes |
---|---|
Bag Cleaning Plant | Yes |
Moisture Tester | Yes |
De-stoning Plant | Yes |
Metal Extractor |
Yes
Staffing
Number of Full Time Skilled Workers
Number of Full Time Labourers
Weighbridge
Number
Capacity (MT)
Length (m)
Type
Within Compound
Within Compound
Building
Length (m)
Width (m)
Height (m)
Building – Wheat Mill
Building – Maize Mill
Walls
Roof
Floor
Conditions & Cleanliness
Outside
Inside
Cracks in Walls or Roof
Yes / No
Yes / No
Signs of Rodent Activity
Yes / No
Yes / No
Signs of Birds Entry
Yes / No
Yes / No
Damaged Gutters/Drains
Yes / No
Yes / No
Signs of Moisture
Yes |
Adjacent Vegetation
Yes / No
Yes / No
Cleanliness
Good / Poor
Good / Poor
Pest Control
Fumigation
Yes / No
Frequency
Weekly / Monthly / Yearly
Contracted
Yes / No
Spraying
Yes / No
Frequency
Weekly / Monthly / Yearly
Contracted
Yes / No
Rodenticides
Yes / No
Frequency
Weekly / Monthly / Yearly
Contracted
Yes / No
Rodent Trapping
Yes / No
Frequency
Weekly / Monthly / Yearly
Contracted
Yes / No
Security
Security
Good / Poor
Compound
Fenced / Not Fenced
Other Comments
Access | |||
---|---|---|---|
Distance from Main Town (km) | 101 | ||
Travel Time if not Located in Town (hours) | 1 | ||
Road Condition to Mill | Good | ||
Road Limitations (if any) | Maximum Width and Max. Tonnage | ||
Rail Connections | Yes / No | ||
On the Railway From | - | To | - |
Other Comments | - |
Milling Capacity | ||
---|---|---|
Commodities | Daily Capacity (MT) | Monthly Activity (MT) |
Wheat | 132 | 2640 |
Maize | 132 | 2640 |
Storage Capacity | ||
---|---|---|
Storage in Metric Tons | Wheat – Covered (MT) | Flour – Covered (MT) |
Within the Compound | 1200 | 1200 |
Outside the Compound |
Loading & Discharge Rates |
---|
34 MT per hour |
Transport Capacity at Mill