Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Port website: www.kerrylogistics.com

​​Port Location and Contact​ 

​​Country​ 

​​Myanmar 

​​Province or District​ 

Mandalay

​​Nearest Town or City​ ​​with Distance from Port​ 

​​Mandalay City/ 13 km from downtown of Mandalay

​​Port's Complete Name​ 

KM Terminal and Logistics Ltd (​​Myitnge Dry Port) ​ 

​​Latitude​ 

21.853889

​​Longitude​ 

​​96.073056

​​Managing Company or Port Authority

KM Terminal and Logistics Ltd

​​Management Contact Person​ 

U Mg Mg Htwe

Senior Admin Officer

+95-9-2014294, Email: Mg.MgHtwe@kerrylogistics.com

Office: +95-9-0255041, 55042, 55044 (fax)

​​Nearest Airport and Airlines with Frequent International Arrivals/Departures​ 

Airport Name: Mandalay International Airport

Airlines: Please see in the airport information

​​Dry Port Picture​

​​​ 

 

​Description and Contacts of Key Companies​ 

...

150,000 TEUs, Reefer Plugs 12, Rail 3 tracks, General Warehouse 6945 Sq. m., Bonded Warehouse 2377.5 Sq. m., Container Freight Station 1000 Sq. m., Empty Depot 10000 TEUs and other equipment’s including Reach Stacker 45 Tons, Forklift 3 tons and 5 tons, Reach Truck and 22 wheels truck with Trailer.

​​Seasonal Constraints

​​Rainy Season​ 

​​No 

​​Major Import Campaigns​ 

​​N/A 

​​Other Comments​ 

N/A


​​​​​Dry Port Handling Equipment​ 

​​Equipment​ 

​​Available​ 

​​Total Quantity and Capacity Available​ 

​​Comments on Current Condition and Actual Usage​ 

​​Dockside Crane​ 

​​No​ 

​​​ 

​​​ 

​​Container Gantries​ 

​​No​ 

​​​ 

​​​ 

​​Mobile Cranes​ 

No

 

 

​​Reachstacker​ 

Yes

45 Tons capacity (1 unit)

Operational

​​RoRo Tugmaster (with Trailer) ​ 

​​No​ 

​​​ 

​​​ 

​​Grain Elevator with Bagging Machines​ 

​​No​ 

​​​ 

​​​ 

​​Transtainer​ 

​​No​ 

​​​ 

​​​ 

​​Forklifts​ 

Yes

​​​2 Tons (1 unit)

3 Tons (2 units)

5 Tons (2 units)

​​​ Operational


Container Facilities 

Facilities 

20 ft. 

40 ft. 

Container Facilities Available 

Yes, 150,000 TEUs, including Container Maintenance and Cleaning

Yes

Container Freight Station (CFS) 

Yes 1,000 Sq. m. 

Yes

Refrigerated Container Stations 

No 

No 

Other Capacity Details 

150,000 TEUs, Reefer Plugs 12, Rail 3 tracks, General Warehouse 6945 Sq. m., Bonded Warehouse 2377.5 Sq. m., Container Freight Station 1000 Sq. m., Empty Depot 10000 TEUs

Yes

Daily Take Off Capacity  
(Containers per Day)  

N/A  

N/A

Number of Reefer Stations  
(Connection Points) 

12 Reefer Stations, also 3 Rail tracks  

 

Emergency Take-off Capacity  

N/A 

N/A 

Off-take Capacity of Gang Shift 
(Containers per Shift)  

N/A 

 N/A


Customs Guidance 

A customs office is set up at KTML compound. Customs services are available during 10:00 ~ 17:00 / from Monday to Friday (excluding National Holidays). For information on customs, please see the following link: 1.3 Myanmar Customs Information. 

Terminal Information

Main Storage Terminal

Storage Type

Number of Storage Facilities

Area (square meters)

Bagged Cargo

n/a

 n/a

Refrigerated Cargo

n/a

n/a

General Cargo

1  

6,945.5 Sq. m.

There is also a bonded warehouse (2,377.5 Sq. m.), a Container Freight Station 1,000 Sq. m. and an Empty Depot with capacity of up to 10,000 TEUs

...

Port Security is managed by KTML Security Staffs. There is a CCTV system in place, handheld metal detectors and Fire Fighting System such as pumps, water storage, supply lines and fire hydrants, fire extinguishers are in place.    

Security 

ISPS Compliant 

Yes  

Current ISPS Level  
(Level 1 = Normal, Level 2 = Heightened, Level 3 = Exceptional) 

2

Fire Engines 

Yes, Fire Fighting System in place

 

Resources Group Logistics Co., Ltd. (Myitnge Dry Port)

Dry Port Overview

RG Logistics Co. Ltd is a local company and is operating a 34.71 Acres in Myitnge Dry Port, Amarapura Township, Mandalay. The Dry Port offers scheduled rail transportation services between Yangon Ywar Thar Gyi Dry Port and Mandalay Myit Nge Dry Port. The facilities and services available for 1,100 TEUs, Reefer Points 16 units, Rail 2 tracks, General Warehouse (4600 Sq. m.), Bonded Warehouse (4600 Sqm), Container Freight Station (4600 Sq. m.) and other equipment’s including Reach Stacker 45 Tons, Forklift 2~10 tons and 24 wheels truck 40 feet with Trailer. The services provided includes Container handling and storage, Container stripping and stuffing, Breakbulk cargo handling and storage, Bulk cargo handling and storage, Container light repairs, Freight forwarding and cargo consolidation services, Banking/insurance/financial services.

​​Port website: https://www.rglogisticsmm.com/mdy-dry-port

​​Port Location and Contact​ 

​​Country​ 

​​Myanmar 

​​Province or District​ 

Mandalay

​​Nearest Town or City​ 

​​with Distance from Port​ 

​​Mandalay City/ 13 km from downtown of Mandalay

​​Port's Complete Name​ 

Resource Group Logistics Co., Ltd (​​Myitnge Dry Port) ​ 

​​Latitude​ 

​​21°50'50"N ​ 

​​Longitude​ 

​​96°04'06"E​ 

​​Managing Company or Port Authority

Resource Group Logistics Co., Ltd

​​Management Contact Person​ 

U Soe Min Shin

Operational Manager

+95-9-765121045,

Email: contact@rglogisticsmm.com

Website: https://www.rglogisticsmm.com/mdy-dry-port

Telephone:

   Dry Port: ‎+959 899880 202, 303,404

   Transport: +959 893161 588, 589

​​Nearest Airport and Airlines with Frequent International Arrivals/Departures​ 

Airport Name: Mandalay International Airport

Airlines: Please see in the airport information

​​Dry Port Picture​ 

​​​ 

  

...

Container Yard 1,100 TEUs, Reefer Plugs 16, Rail 2 tracks, General Warehouse 4600 Sq. m., Bonded Warehouse 4600 Sq. m., Container Freight Station 4600 Sq. m., and other equipment’s including Reach Stacker 45 Tons, Forklift 2,3,4,7 and 10 tons and 24 wheels truck with Trailer. RG Logistics is running Dry Port operation with about 100 staffs (permanent staffs 40 and casual labor 60) daily.

​​Seasonal Constraints

​​​ 

​​Occurs​ 

​​Time Frame​ 

​​Rainy Season​ 

​​No 


​​Major Import Campaigns​ 

​​N/A 

​​N/A​ 

​​Other Comments​ 

N/A

​​​​​​​

Dry Port Handling Equipment​ 

​​Equipment​ 

​​Available​ 

​​Total Quantity and Capacity Available​ 

​​Comments on Current Condition and Actual Usage​ 

​​Dockside Crane​ 

​​No​ 

​​​ 

​​​ 

​​Container Gantries​ 

​​No​ 

​​​ 

​​​ 

​​Mobile Cranes​ 

No

2.5 Tons capacity

Operational

​​Reachstacker​ 

Yes

1.45 Tons capacity

Operational

​​RoRo Tugmaster (with Trailer) ​ 

​​No​ 

​​​ 

​​​ 

​​Grain Elevator with Bagging Machines​ 

​​No​ 

​​​ 

​​​ 

​​Transtainer​ 

​​No​ 

​​​ 

​​​ 

​​Forklifts​ 

Yes

2 Tons (6 units)

3 tons (3 units)

4 tons (2 units)

7 tons (1 unit)

10 tons (1unit)

​Operational

 


Container Facilities 

Facilities 

20 ft. 

40 ft. 

Container Facilities Available 

Yes, 1,100 TEUs

Yes

Container Freight Station (CFS) 

Yes 4,600 Sq. m. 

Yes

Refrigerated Container Stations 

No 

No 

Other Capacity Details 

Reefer Plugs 16, Rail 2 tracks, General Warehouse 4600 Sq. m., Bonded Warehouse 4600 Sq. m., Container Freight Station 4600 Sq. m.

Yes

Daily Take Off Capacity  
(Containers per Day)  

N/A  

N/A

Number of Reefer Stations  
(Connection Points) 

16 Reefer Stations, also 2 Rail tracks  

 Yes

Emergency Take-off Capacity  

N/A 

N/A 

Off-take Capacity of Gang Shift 
(Containers per Shift)  

N/A 

 N/A


Customs Guidance 

Currently custom service is not available yet in RG Logistics Myitnge Dry Port and expect to provide service around Mid of 2020.

...

Terminal Information

Main Storage Terminal

Storage Type

Number of Storage Facilities

Area (square meters)

Bagged Cargo

n/a

 n/a

Refrigerated Cargo

n/a

n/a

General Cargo

1  

4,600 Sq. m.

There is also bonded warehouse 4600 Sq. m. and Container Freight Station 4600 Sq. m.

...

Port Security is managed by RG Logistics Security Staffs. There is a CCTV system in place, handheld metal detectors and Fire Fighting System like are pumps, water storage, supply lines and fire hydrants, fire extinguishers in place.    

Security 

ISPS Compliant 

Yes  

Current ISPS Level  
(Level 1 = Normal, Level 2 = Heightened, Level 3 = Exceptional) 

2

Fire Engines 

Yes, Fire Fighting System in place