Nepal - 2.1.5 Biratnagar Dry Port
Home

Port Overview 

Biratnagar Integrated Check Point (ICP) is spread over a total area of about 186 acres along the Nepal-India borders constructed by India and handed over to Nepal to facilitate for trade logistics between the two countries. It has a common platform for traders to get customs clearance for traded goods and offers services like banking, immigration, quarantine, warehousing, parking yard, etc facilitating both importers and exporters.  

 

Biratnagar ICP is 7 kilometers (4 mi) North of Nepal's southern border with Biharstate, India. Biratnagar Customs Office ranks 4th in the overall volume of trade in Nepal after Birgunj Customs, Bhairahawa Customs, and Birgunj Dry Port. There are nine sub-customs offices under its jurisdiction. Major imported goods through this custom are petroleum products like diesel, petrol, LP gas, crude soya-bean oil, motorcycles, betel nuts, M.S. Billets, iron structures, coal, and glazed tiles. Major exported goods are cardamom, woven fabrics, jute sacking bags, G.I.Wire, PP GI Coil, Dyed Yarn, jute hessian fabric, brass strip in Coils, and corrugated galvanized iron sheets. Biratnagar ICP at the border is well connected to the gateway ports of Kolkata (600 km) by road or by rail to Jogbani, Bihar.  

 

Port website: ICP Biratnagar – Trans Nepal Freight Services (transnepaldryport.com) 

 

Port Location and Contact 

Country 

Nepal 

Province or District 

Koshi Province, Morang district 

Nearest Town or City 

with Distance from Port 

7 km North of Biratnagar City accessed Via H08 

Port's Complete Name 

Biratnagar Integrated Check Point  

Latitude 

26.38237 

Longitude 

87.26900 

Managing Company or Port Authority 

 

TransNepal Freight Services Pvt. Ltd 

Management Contact Person 

Anand Kumar Singh 

TransNepal Tower Head Office 

Piyush Marga, Biratnagar-5, Morang,Nepal 

Tel: 021-501441 

Fax: 021-501470 

E-mail: ananda@transnepaldryport.com 

 

Laxmi Subba 

Manager 

ICP Biratnagar, Buddha Nagar 

Mobile: 9842032956/9814387011 

 

Nearest Airport and Airlines with Frequent International Arrivals/Departures 

Biratnagar National Airport 12 KM North 

Port Picture 

image-20240507123900-1

Aerial View of Biratnagar ICP  

 

Description and Contacts of Key Companies 

 

SN 

Agencies related to Operation of ICP 

Name 

Multimodal Transport Operators 

TransNepal Freight Services Pvt. Ltd 

Transport Management Company 

N/A 

Customs 

Biratnagar Customs Office 

Freight Forwarders 

N/A 

Banks 

Rastrya Banijya Bank,Rani, Buddhanagar ICP Branch 

Quarantine 

Plant, Animal, Food Quarantine, Lab 

Shipping lines 

N/A 

Customs Agent 

Mrigatrishna clearing, Bijay clearing, Shah clearing, Devekinandan clearing, Eastern clearing,  Danfe Custom Clearing, D.G Custom Service, Shivam Clearing House, Rani Clearing services, Pathivara Bhansar Sewa, D.P Clearing services, Trans misson cargo clearing, P.R Regmi bhansar jach pass sewa, Gupta Custom Clearing, Goodwill Clearing & Logistics Service etc (50+ agents are providing customs clearance services) 

 

For more information on port contacts, please see the following link: 4.4 Port and Waterways Companies Contact List

Port Performance 

The Port is currently not congested and operates on a two-lane road. The average waiting time between arrival and berthing is 1 to 2 days. 

Seasonal Constraints 

 

Occurs 

Time Frame 

Rainy Season 

Yes 

From June to August 

Major Import Campaigns 

Yes  

Months of Festivals Aug to Oct 

Other Comments 

ICP Biratnagar is in operation merging Rani customs offices.  

 

Handling Figures for 2022  

Vessel Calls 

40 

Container Traffic (TEUs) 

6651 

 

Handling Figures Bulk and Break Bulk for 2022  

Bulk (MT) 

71340 

Break bulk (MT) 

 

Discharge Rates and Terminal Handling Charges 

Biratnagar ICP Tariff effective from 17 August 2022 and following is the Discharge Rates and Terminal Handling Charges: Tariff – Trans Nepal Freight Services (transnepaldryport.com) 

 

Port Handling Equipment 

The port equipment is managed by the operator. The port has transitioned from using manual labour to handle cargoes to mechanical port handling equipment as the volume of cargoes passing through increases. 

 

Equipment 

Available 

Total Quantity and Capacity Available 

Comments on Current Condition and Actual Usage 

Dockside Crane 

 Yes 

40 ton 

 

Container Gantries 

N/A 

 

 

Mobile Cranes 

Yes  

Escorts F-15 

Capacity 14 ton at 1.5 m, 900 kg at 15.8 m 

Reach stacker 

Yes 

1 – 14 MT. 

 

RoRoTugmaster (with Trailer) 

N/A 

 

 

Grain Elevator with Bagging Machines 

 N/A 

 

 

Transtainer 

N/A 

 

 

Forklifts 

Yes  

One, 3000kgs 

 

Pallet Trolly 

Yes 

Four, 5000 kgs, 3000 kgs 

 

 

Container Facilities 

The space available for the container is sufficient, but the Port does not have a refrigerated container station and storage related to cold storage.  

Facilities 

20 ft 

40 ft 

Container Facilities Available 

N/A 

N/A 

Container Freight Station (CFS) 

N/A 

N/A 

Refrigerated Container Stations 

N/A 

N/A 

Other Capacity Details 

N/A 

N/A 

Daily Take Off Capacity  
(Containers per Day) 

N/A 

N/A 

Number of Reefer Stations  
(Connection Points) 

1 with 4 plugs in facility  

(Dual service for both 20 dt and 40 ft) 

 

Emergency Take-off Capacity  

N/A 

N/A 

Off take Capacity of Gang Shift  
(Containers per Shift) 

N/A 

N/A 

Customs Guidance 

The customs clearance process at the dry port of Biratnagar is automated using the web-based ASYCUDA system, which allows for the pre-clearing of goods. Customs pre-clearance of goods takes approximately 1-2 working days. The location of the Customs office is within the dry port. 

 

MAIN STORAGE TERMINAL 

The Port has a warehouse, parking, and open yard areas as listed below. The port does not have cold storage facilities and does not have a specific area designated for humanitarian cargo.  

  • Warehouse arrival with refrigeration facilities (import side) with a capacity of 1520 sqm 

  • Warehouse departure (export side) with 740 sqm 

  • Animal shed (import side) 100 sqm, Process shed (import side) 2500 sqm, Process shed (export side) 2500 sqm, Process Cabins 31 Nos 418 sqm. 

  • A vacant area for adding up to 3,900 m2 warehousing/parking area for holding 150 TEUs. 

  • A parking area for 80 trucks 

  • Dedicated shed- 1 

  • Weight bridge- 2 (1 on the import side and 1 on the export side) 

  • Electrical Sub-Station equipment: Two DG Sets, One 380 KVA and 125 KVA Transformer, AVR, LT, and HT panel) 

  • Warehouse house Arrival (with refrigeration) facilities (Import Side- 1520 m2 

  • Warehouse house Departure (Export Side- 740 m2 

  • Process Shed (Import Side) 2500 m2 

  • Process Shed (Export Side)- 2500 m2 

  • Process Cabins 31 Nos. - 418 m2 

  • Firefighting systems including pumps (5 Nos) water storage, supply lines, and hydrants. 

Storage Type 

Number of Storage Facilities 

Area (m2) 

Bagged Cargo 

warehouse 

1375 

Refrigerated Cargo 

N/A 

 

General Cargo 

Container Cargo New warehouse 

3700 

 

Port Security 

The port is surrounded by a concrete wall. A CCTV (95 nos.) monitoring system and security is provided by the Nepal Armed Police Forces of Nepal Government and a third-party security company from Sudarshan Security Pvt. Ltd 24/7. 

 

 

 

image-20240507124138-3

Integrated Check Post (ICP) Biratnagar It is 2.9 Km South of Biratnagar ICP and 14.8 Km South of Biratnagar Airport. 

 

image-20240507124138-4

View of ICP from the main building. 

 

image-20240507124138-5

image-20240507124138-6

image-20240507124138-7

Warehouse and parking area 

image-20240507124138-8

Container yard for railway Container Yard-1 of 4500 m2 is under construction. 

image-20240507124138-9

Crane, forklift and reach stacker Service      

image-20240507124138-10

PROCESSING SHED 

image-20240507124138-11

QUARANTINE BLOCK                                                                     COOL ROOM 

 

 