Indonesia
2.2.36 Indonesia Aceh Cut Nyak Dhien Airport
Home

Cut Nyak Dhien Airport is located in Nagan Raya district, about 21 km from Meulaboh city, the capital of West Aceh district. It is a domestic airport that serves as the main access point to the West and South Aceh districts and is operated by the Unit Penyelenggara Bandar Udara (UPBU), Directorate General of Civil Aviation (DGCA), Ministry of Transportation.

Since January 2019 there are no commercial flights scheduled in this airport due to low of load factor from and to the destination. The airport operates from 23:00 – 06.00 UTC (07:00 – 14:00 WIB) for air traffic movements 

Airport Overview

Airport Location and Contact

Country

Indonesia

Province or District

Nagan Raya District, Aceh Province

Nearest Town or City with Distance from Airport

Meulaboh City, 21km

Airport’s Complete Name

Cut Nyak Dhien Airport

Latitude

4.047344

Longitude

96.250612

Elevation (ft and m)

16.42 ft / 5 m

IATA Code

MEQ

ICAO Code

WITC

Managing Company or Airport Authority

Unit Penyelenggara Bandar Udara (UPBU), Directorate General of Civil Aviation (DGCA), Ministry of Transportation

Cut Nyak Dhien Airport

Management Contact Person

Darus (Head of Administration)

Ph.081377706680

Email cnd_naganraya@yahoo.com

Open From (hours)

23:00 UTC (07:00 WIB)

Open To (hours)

06:00 UTC (14:00 WIB)

Airport Picture

Note:

1.     Runway

2.     Apron

3.     Passenger Terminal

4.     Airport Office

Description and Contacts of Key Companies

UPBU Cut Nyak Dhien, operator in Airport Cut Nyak Dhien, Nagan Raya. 

Contact: Roni (Plt Head of UPBU)

                Ph. 087882844116 / 082166676667

                Email t.cut.ali@gmail.com

Airlines in Cut Nyak Dhien Airport:

Susi Air (www.susiair.com)

Wings Air (lionair.co.id)

Passenger and Cargo Performance Indicator

Performance for 2018


Per Year

Per Month

Per Day

Total Aircraft Movements

1,268



Total Passengers

37,889



Total Capacity of the Airport (MT)




Current Activity of the Airport (MT)




Current use by Humanitarian Flights (UNHAS)

No



Runways

Runway #1

Runway Dimensions

L1,800m x 30m

Orientation

14 – 32

Surface

Asphalt (PCN 23 F/C/Y/T)

Airport Infrastructure Details

Customs

No

JET A-1 fuel

No

Immigration

No

AVGAS 100

No

Terminal Building

Yes

Single Point Refueling

No

Passenger Terminal

Yes

Air Starter Units

No

Cargo terminal

No

Ground Power (mobile)

Yes

Pax Transport to Airfield

No

Ground Handling Services

Yes

Control Tower

Yes

Latrine Servicing

No

Weather Facilities

Yes

Fire Fighting Category (ICAO)

Category: IV

Catering Services

No

De-icing Equipment

No

Base Operating Room

Yes

Parking Ramp Lighting

Yes

Airport Radar

No

Runway Lights

Yes

NDB

Yes

VOR

No

ILS

No



Airport Operating Details

Operating Details

Maximum Sized Aircraft that can be Offloaded on Bulk Cargo

ATR 72-600

Maximum Sized Aircraft that can be Offloaded on Pallet


Total Aircraft Parking Area (m²)

60 m x 40 m

Storage Area (m3 and MT)

Nil

Handling Equipment

Elevators / Hi Loaders

No

Max Capacity (MT)


Max Height (m)


Loading Ramps

No

Other Comments

-

Customs Guidance

For more information on customs in Indonesia, please see the following link: http://www.beacukai.go.id/

Storage Facilities

No storage facility available.

Airfield Costs

For information on airport rates and charges, please see the following link: 

www.dephub.go.id (PP.15 Tahun 2016) 

http://jdih.dephub.go.id/assets/uudocs/perpres/2016/PP_15_Tahun_2016.pdf 

NAVIGATION CHARGES

The costs below are charged based on the operational hours.

Charges

Aircraft Weight - MTOW (kg)


0 - 7,000

7,001 - 136,000

136,001 and over

Navigation (per journey) USD - $


Landing USD - $

-

-

-

Night Landing USD - $

-

-

-

Night Take-Off USD - $

-

-

-

Parking


Handling Charges

-

-

-

FUEL SERVICES CHARGES

The Aircraft Refuelling Depot is available at the airport for aviation fuel. It is managed by PT. Pertamina (Persero).

For more details can be found: http://aviation.pertamina.com/News.aspx?p=price

CARGO TERMINAL CHARGES

Import Charges

Type of Charge

Rate USD - $ per kg

Comments

Handling Charge

All service costs are handled by each ground handling company with the approval of the Airport Authority.

Break Bulk Fee

Diplomatic Mail

Strong Room – per consignment

Cold Storage Fee

Delivery Outside Normal Working Hours

Preparation of substitute AOA – Invoice – Receipt

Storage per Day

Export

Handling Charges – Un-palletized Cargo

All service costs are handled by handled by each ground handling company with the approval of the Airport Authority.

International Air Waybill

Local Air Waybill

Air Way Bill Amendment - Cancellation

Air Way Bill Documentation

Diplomatic Mail

Storage Charges per Day

*in case any international flights

AIR-BRIDGE CHARGES

No air-bridge facility available.

Security

Cut Nyak Dhien Airport is a civil airport and has 2 (two) security posts:

  • One at run way edges
  • One at the entrance gate





Jump to top