Libya
2.1.7 Libya Port of Tobruk
Home

Port Overview

The Port of Tobruk is a port located at Tobruk, Libya. Start operating in 1986, it is located in Eastern Libya near the Egyptian border - about 450 km (280 mi) east of Benghazi. The entrance to the main channel into the port is between Tobruk point ( 32.066667°, 24.016667°) and the point of Marsa Ummash Shawush .

As a result of the Libyan Civil War, the port was temporarily closed due to clashes between protestors and government forces and reopened on 28 February 2011 for oil exports. The port re-opened soon after the civil war ended. As of August 2014, all port traffic from the Port of Benghazi is diverted to the port of Tobruk due to the closure of the port in Benghazi as a direct result of the prevailing security situation in Libya.

The port working hours: from Saturday to Thursday, 7:00 to 18:00.

The port still running limited activities out of the working hours and holidays, based on the need.

Port website: http://www.lma.ly/

Key port information may also be found at: http://www.maritime-database.com

 

Port Location and Contact

Country

Libya

Province or District

Tobruk

Nearest Town or City with Distance from Port

Tobruk

1.5 km

Port's Complete Name

Port of Tobruk

Latitude

32.07675°

Longitude

23.980889°

Managing Company or Port Authority

Libyan Port Company

Management Contact Person

Mohammed Fayaz

Nearest Airport and Airlines with Frequent International Arrivals/Departures

Tobruk Airport

Only Libyan Airlines depart and arrive to the airport (Buraq. Afriaqia. Al burniq )

 

Port Picture

Image
Port Picture

Description and Contacts of Key Companies

Tobruk Port is managed and operated by The Libyan Ports Company – Eastern coast.

For more information on port contacts, please see the following link:

4.4 Port and Waterways Companies Contact List

Port Performance

As of August 2014, all port traffic from the Port of Benghazi is diverted to the Port of Tobruk due to the closure of the Port in Benghazi as a direct result of the prevailing security situation in Libya.

The port has ten anchorages, with a six-vessel capacity each.

Seasonal Constraints

 

Occurs

Time Frame

Rainy Season

Yes

From October to March

Major Import Campaigns

No

 

Other Comments

A Mediterranean type of climate prevails. The rainy season is from October to March with heavy showers of rain only along the narrow coast in the northern part of Libya. Issues to consider for Bulk shipping operations.

 

Handling Figures for 2020

Vessel Calls

76

Container Traffic (TEUs)

1,366

 

Handling Figures Bulk and Break Bulk for 2020

Bulk (mt)

232,926

Break bulk (mt)

38,519

Discharge Rates and Terminal Handling Charges

The port tariffs, as advised by the Port Management, are low compared to the other ports of the region, and government subsidies are in place.

On one hand the lower port rates endeavour to keep the costs of the commodities imported into Libya at an affordable rate, however conversely, there is no mechanism in the rates structure or operating budgets to include a percentage for the purchase of equipment, structured maintenance and the development through training of the human capital. The tariffs are very low, being established back to the 1980s. The below table illustrates open yard container storage tariff in Libyan ports in 2020. 

 

Weeks

 Approx.Total Port tariff / container

20 ft (33.2 m³ )

40 ft (76.3  m³)

40 ft (88.4  m³)

1st

300

600

620

2nd

320

639

662

3rd

360

716

749

4th

435

871

922

5th

513

1025

1094

 

 Berthing Specifications

Type of Berth

Quantity

Length

(m)

Maximum

Draft (m)

Conventional Berth

5

600

7

Container Berth

4

800

8

Port Handling Equipment

Port equipment is managed by the government.

Equipment

Available

Total Quantity and Capacity Available

Comments on Current Condition and Actual Usage

Dockside Crane

No

   

Container Gantries

No

   

Mobile Cranes

Yes

2

50 mt and 100 mt

Reachstacker

Yes

2

5x45 mt capacity

RoRo Tugmaster (with Trailer)

Yes

2

5x45 tons capacity

Grain Elevator with Bagging Machines

Yes

2

1x 1 Grain ship pneumatic conveyor 120 mt per hour

Transtainer

Yes

2

45 mt

Forklifts

Yes

10

 

Container Facilities

Facilities

20 ft

40 ft

Container Facilities Available

90000 m2 open yard to store 20 ft & 40 ft

Other Capacity Details

2000 m2 to store dangerous goods

Emergency Take-off Capacity

150

150

Customs Guidance

According to the national legislation, all humanitarian cargos are exempted from duties and taxes. Exemption letter/certificate should be obtained from MOFA and sent to port authority prior to shipment arrival.

Once the custom clearance agent provides all clearance documents and finalizes the normal process, the shipment will be temporarily released, and transported (the shipment would be escorted by custom police) to the organization’s warehouse.  Normally it takes from one to three working days to temporarily clear the shipment.

The warehouse will be closed and sealed until the Food and Drug Control Centre tests the commodities and confirms the compliance of the shipment with Libyan standards, thus, issuing the final release.

For more information on customs in Libya, please see the following link: 

1.3 Customs Information 

 

Terminal Information

MULTIPURPOSE TERMINAL

Tobruk port berths main activity is receiving General Cargo / Containers / Molding / Livestock / Oil Quay.

 

GRAIN AND BULK HANDLING

The available handling option at the port is to discharge grain and bulk directly to trucks or any mobile tanks to store it outside of the port.

 

MAIN STORAGE TERMINAL

Storage Type

Number of Storage Facilities

Area (m2)

Bagged Cargo

2

1,800

Refrigerated Cargo

N/A  

General Cargo

1

50000

Stevedoring

The Port of Tobruk is operated by a governmental company, the Libyan Ports Company.

Hinterland Information

All cleared items are moved out of the port by private trucks. The trucks are categorized by size and type, each truck has a sequence number, and all are recorded in a waiting list. The trucks movement process is managed by the Union of Trucks,

Port Security

The port i said to be International Ships and Port Security (ISPS) compliant, presently undergoing an ISPS Audit Level 2.

 

Security

ISPS Compliant

Yes

Current ISPS Level
(Level 1 = Normal,

 Level 2 = Heightened,

Level 3 = Exceptional)

2

Police Boats

Yes

Fire Engines

No

Jump to top