Port Overview
The New Port of La Union is one of El Salvador’s main infrastructure with total investment US$200 million. It was inaugurated by GoES in June 2010. The project was financed by Japanese Bank for International Cooperation (JBIC) and a government agency, Comisión Ejecutiva Portuaria Autonoma (CEPA).
Among the facilities that the Port of La Union offers to potential licensees include: high level of port infrastructure, with more than 50 ha of work (1 Stage), with deep-water docks where boats can dock Post Panama type that can mobilise up to 6500 TEUs; space for future development of facilities, road connectivity and the possibility of developing a rail connectivity.
Port website: http://www.cepa.gob.sv/tag/puerto-la-union
Key port information may also be found at: http://www.maritime-database.com
Port Location and Contact |
|
Country |
El Salvador |
Province or District |
La Union |
Nearest Town or City with Distance from Port |
La Union DISTANCE (2km) |
Port's Complete Name |
Puerto de la Unión Centroamericana |
Latitude |
13° 20’ 9’’ north latitude |
Longitude |
89° 03’ 20” west longitude |
Managing Company or Port Authority |
CEPA El Salvador – Comisión Ejecutiva Portuaria Autónoma |
Management Contact Person |
Federico Anliker |
Nearest Airport and Airlines with Frequent International Arrivals/Departures |
Airport of Ilopango, 177.6 km |
Port Picture
Port Performance
Since its inauguration in 2010, the port has been barely used (95 vessels between 2014 and 2017). The government of Japan, through JICA, in 2019, started an assessment to the port in order to support the improvement of the basis for economic and social development through the development of economic infrastructure. In addition, it will promote technical assistance that contributes to the activation of the Port, built under the Reimbursable Financial Cooperation scheme. With this strategy is its hoped to define its role against Port of Acajutla and its complementarity to Puerto Cortes in Honduras and Port Santo Tomas de Castilla in Guatemala.
Statistics for 2019 show a total reception of 21 vessels (18,041.19MT: 23,242 TEU).
At the moment the type of ships that can enter to the port are those type of Panamax that mobilise 4,66 TEU or Post Panamax mobilising 6,500 TEU.
Port size: small
Access Chanel: Dredging 13 million m3 approx.
Interior Canal:
- Length: 5.0 km.
- Deep: 14.00 MT.
- Width: 140 MT.
- Signal Range: 3 Mn.
Exterior Canal:
- Length 17.00 Km.
- Deep: 14.50 MT.
- Width: 140 MT.
- Signal Range: 4 Mn
Navigation Aids.
- 16 Marker buoys.
- GPS Radios
- 1 Navigation Lighthouse
- Visibility: 22 Nautical Miles
Seasonal Constraints |
||
|
Occurs |
Time Frame |
Rainy Season |
Yes |
From May to November |
Major Import Campaigns |
No |
|
Handling Figures for 2019 |
|
Vessel Calls |
N/A |
Container Traffic (TEUs) |
873 (2011) |
Handling Figures Bulk and Break Bulk for 2019 |
|
Bulk (MT) |
|
Break bulk (MT) |
17,452.06 |
Discharge Rates and Terminal Handling Charges
For information on port rates and charges, please see the following link: https://www.transparencia.gob.sv/institutions/cepa/documents/servicios
Berthing Specifications
Type of Berth |
Quantity |
Length (m) |
Maximum Draft (m) |
Comments |
Conventional Berth |
1 |
220 |
10 |
|
Container Berth |
1 |
340 |
15 |
Total area: 174,722 m2, Capacity: 350,000 TEUs |
Silo Berth |
No info |
No info |
No info |
|
Berthing Tugs |
None |
|
|
|
Water Barges |
By pipeline |
|
|
|
General Cargo Handling Berths
Cargo Type |
Berth Identification |
Imports - Bagged Cargo |
No info |
Exports - Bagged Cargo |
No info |
Imports and Exports - RoRo |
No info |
Other Imports (2019) |
18,041.19 |
Port Handling Equipment
The port equipment is handled by governmental personnel. The equipment is not used 100% since very few vessels arrive there.
Equipment |
Available |
Total Quantity and Capacity Available |
Comments on Current Condition and Actual Usage |
Dockside Crane |
|
No information |
No information |
Container Gantries |
Yes |
4 |
|
Mobile Cranes |
|
No information |
No information |
Reachstacker |
|
No information |
No information |
RoRo Tugmaster (with Trailer) |
Yes |
5 tugmasters, 5 trailers |
No information |
Grain Elevator with Bagging Machines |
|
No information |
No information |
Transtainer |
Yes |
4 |
No information |
Forklifts |
Yes |
4 / 6,000 lb |
|
Container Facilities
Facilities for containers are mostly empty due that not many vessels arrive to the port.
Facilities |
20 ft |
40 ft |
Container Facilities Available |
|
560 x 560 mts |
Container Freight Station (CFS) |
No information |
|
Refrigerated Container Stations |
No information |
|
Other Capacity Details |
No information |
|
Daily Take Off
Capacity |
No information |
|
Number of Reefer
Stations |
No information |
|
Emergency Take-off Capacity |
No information |
|
Off take Capacity of Gang
Shift |
No information |
|
Customs Guidance
Although there is little movement at the port, Customs office is active. There is no information regarding on how long it takes to get shipment out of the port.
There is also an office in La Union: 3ra calle Pte. Sector La esperanza, Colonia Belén, No. 22, La Union. Phone No.: +503 2604-4106 / 2637-0173.
Terminal Information
MULTIPURPOSE TERMINAL
Multipurpose terminal is available with the following information:
Berth length: 220 m
Depth: -10 m
Total area: 115,981 m2
There is also a Ro Ro and passenger terminal with the following information:
Berth length: 240 m
Depth: -9.5 m
Total area: 34,871 m2
GRAIN AND BULK HANDLING
There is no information with this regard.
MAIN STORAGE TERMINAL
There is a warehouse for general cargo, which is located at the multipurpose terminal and its working hours are as follow:
- Monday: 08:00 – 17:00hrs
- Tuesday to Thursday: 07:00 – 17:00hrs
- Friday: 07:00 – 15:45hrs
So far what has been stored is: iron and steel (metal, ingots, rolls, coils, sheets, messes, loose parts, others) and fractional General cargo. Whichever shipping company or customer must present the Tarja note and the partial bill of departure and a payment of USD 0.39 par metric ton.
Port Security
Port security is maintained 24 hours a day.
Security |
|
ISPS Compliant |
Yes |
Current ISPS Level (Level 1 = Normal, Level 2 = Heightened, Level 3 = Exceptional) |
1 |
Police Boats |
No info |
Fire Engines |
Yes |