Liberia
Liberia - 2.1.1 Liberia Port of Monrovia
Home
 

Key port information can also be found at the following links:

Maritime Database information on Liberia

National Port Authority of Liberia

Port Overview

APM Terminals has constructed a 600-meter quay at the Freeport of Monrovia with a 50-year warranty. The quay project costs US $50 million and is in compliance with the Concession Agreement signed with the Liberian Government. The commencement of a US $34.5 million terminal modernization program, which is expected to be completed in 23 months, will include safety features, a new Administration and Operations building, yard pavement, new cargo gates, real time updates of container movements; a conventional drainage system; a biometric access control system, a closed circuit television system and a GPS base container location system. When completed, the terminal will have a storage capacity of over 10,000 TEUs. During the construction period, the existing container stacking area will become more compressed, resulting in block-stacking of containers and increased yard density. APM Terminals Liberia’s import cargo volume has increased by 33 per cent as of the first half of 2015 compared with the same period in 2014. The reduced yard space resulting from the construction and the recent surge in volumes, will undoubtedly adversely affect their service delivery during the course of the project.

Port Location and Contacts

Country

Liberia

Province or District

Montserrado

Town or City (Closest location) with Distance (km)

Name: Monrovia

Distance: 1 km

Port's Complete Name

Port of Monrovia

Latitude

6.566667

Longitude

-10.78333

Managing Company or Port Authority

National Port Authority

APM Terminal for the main quay 

Management Contact Person

George G. Adjei

Closest Airport and Frequent Airlines to / from International Destinations

Airport Name: Roberts International Airport

Airlines: Royal Air Morocco, British Airways, Kenya Airways

Port Picture

Description and Contacts of Key Companies

The main company is APM Terminals which manages the container and bulk terminal. The landowner is the National Port Authority.

For information on Liberia port contact details, please see the following link:  4.4. Port and Waterways Company Contact List

Port Performance

The Port of Monrovia is the gateway to Liberia and its capital city, where 90% of the country’s economic activity takes place. APMT is planning to double the actual capacity of the port by introducing new equipment such as a modern terminal operating system and a terminal accounting system. The port currently is not congested and there is no established priority for humanitarian cargo.

Seasonal Constraints

Yes / No

From <month> to <month>

Rainy Season

Yes

May to October

Major Import Campaigns

No

 

Handling Figures

Year: 2014

Vessel Calls

391

Container Traffic (TEUs)

78,579

Handling Figures Bulk and Break Bulk

Year: 2014

Bulk (MT)

560,000

Break bulk (MT)

240,000

Discharge Rates and Terminal Handling Charges

It is recommended to contact APMT directly for any inquiry on charges and rates. However, the charges applicable by APMT can be found in Annex I: Tariffs of APM Terminals Liberia Ltd.

Berthing Specifications

Type of Berth

Quantity

Length (m)

Maximum Draft (m)

Conventional Berth

1

200

12.5

Container Berth

1

200

12.5

Silo Berth

1

200

12.5

Berthing Tugs

2

   

There is only one newly constructed quay of 600 m long available in the terminal and which is divided to 3 sections or berths (1, 2 and 3). The silo berth is usually n. 1, the container berth is n.2 because it is in the middle and the 3rd berth is used as the conventional berth. In case of need, any berth can be used for other purposes than here before indicated. The port is not provided with fixed shore cranes and therefore all vessels calling the port must be prepared to operate with their own crane.

General Cargo Handling Berths

Cargo Type

Berth Identification

Imports - Bagged Cargo

1 jetty

Exports - Bagged Cargo

1 jetty

Imports and Exports - RoRo

1 commercial quay

Other Imports

1 commercial quay

Port Handling Equipment

The port equipment is managed privately by APM Terminal. In addition to the equipment here below, the Terminal has 2 empty handlers of a capacity of 10 mt each. 

Equipment

Available
(Yes / No)

Total Quantity and Capacity Available

Comments on Current Condition and Actual Usage

Dockside Crane

No

   

Container Gantries

No

   

Mobile Cranes

No

   

Reachstacker

Yes

6 x 45 mt

In good condition. Expecting additional 2 in November 2015.

RoRo Tugmaster (w/ Trailer)

Yes

 

There are 9 terminal tractors to transport from the quay to the storage yard.

Grain Elevator w/ Bagging Machines

No

   

Transtrainer

No

   

Forklifts

Yes

1 x 14 mt
1 x 12 mt
2 x 5 mt

All 4x4 and in good condition

 

Container Facilities

The container facility is composed of the quay, container yard and a building for the APMT administration.

 

Facilities

20 ft

40 ft

Container Facilities Available

Yes

Yes

Container Freight Station (CFS)

Yes

Yes

Refrigerated Container Stations

Yes

Yes

Other Capacity Details

   

Daily Take Off Capacity (Containers per day)

n/a

 

Number of Reefer Stations (connection points)

120

 

Emergency Take-off Capacity (Give an indication)

Depends on the vessel’s cranes.

 

Off take capacity of gang shift (in Containers per shift)

There are 2 shifts per day.
Depends on the vessel’s cranes.

 

Customs Guidance 

There is a customs office at the port and outside the terminal. All the relevant documents concerning any shipment should be finalised by the Customs before the arrival of the ship at the port.

Shipping & Clearing Procedures

STEP A:

1. Arrange shipment of cargo through a reputable shipping company or freight forwarder.

2. Obtain and transmit the original Bill of Lading and invoice to the consignee before the cargo arrives.

3. Contact BIVAC at the port of origin to arrange for pre-inspection. The consignee will be given a CRF (Clean Report of Finding) certificate.

 

STEP B1: CARGO WITH PRE-SHIPMENT INSPECTION (PI)

1. Take a copy of the pre-inspection report (or CRF), the Bill of Lading and the invoices to the Ministry of Commerce counter for IPD (Import Permit Declaration) processing and to BIVAC for inspection approval. (For Freeport of Monrovia customers, visit the One-Stop-Shop in the Freeport of Monrovia).

2. Proceed to the Bank Section for Payment Slip and make a payment at the Central Bank for government duties, and the private bank for terminal and port charges.

3. Proceed to the In-Gate office for logging of documents, to the Collector’s Office for approval and sealing, and the Wharfing Section for manifest closure.

4. Proceed to the cargo yard, where your container or non-containerized cargo can be inspected by the clearing agent/broker and loaded for inland transport to final destination.


STEP B2: CARGO WITHOUT PRE-SHIPMENT INSPECTION / OR DESIGNATION INSPECTION (DI) 

1. Follow Step BI, 1 through 3. 

2. Cargo is transported from the cargo yard to the BIVAC yard for scanning and x-ray for verification against the items declaration list; Cargo or container is then relocated to cargo yard.

3. Proceed to the cargo yard, where your container or non-containerized cargo can be inspected. 

Moreover, to send and clear goods through the NPA, customers work in tandem with their shipping line and the One Stop Shop in the Freeport of Monrovia to obtain documents needed for clearance and to pay duties and port charges. The One-Stop-Shop is a clearing house with the mandate to assist all importing and exporting customers with cargo clearing in a central location. It consists of the BIVAC, Central Bank, two commercial banks, Customs and APM Terminals. The One-Stop-Shop was launched in 2009 in collaboration with the NPA, the Government of Liberia and international development partners in an effort to reduce barriers to trade. With the strategic location of all relevant agents in one place, the steps to clear goods from the Freeport of Monrovia have reduced dramatically.

For information on Liberia Port customs guidance, please see the following link: 1.3 Liberia Customs Information

Terminal Information

Multipurpose Terminal

The only terminal available at the Port is a multipurpose terminal managed by APM Terminal.  

Grain and Bulk Handling

There are no facilities at the port for grain and bulk handling and there are no companies available for bagging. To note that there are 4 grabs for grain that the APM Terminal can facilitate during the offloading of grains if requested.

Main Storage Terminal

The main storage area in the Terminal is the yard for the containers which is around 10 hectares. There are no storage facilities in the Terminal for general cargo, bagged or bulk if not containerized.

Stevedoring

APMT subcontracts companies for stevedoring to do the handling of the vessel, lashing and unlashing the containers. At the Terminal there are 250 AMPT staff and 300 subcontractors’ labourers at any given time. 

Hinterland Information

For general loose cargo and rice, take into consideration that there is no storage facility at the terminal immediately after the arrival of the ship. The cargo is offloaded from the vessel directly on the trucks provided by the Monrovia Freeport Truckers Association. For the containers, they are offloaded on the empty handlers which will position them in the container stock area. 

 

Port Security

The Terminal security has been enhanced in the last years. The security services are subcontracted by APMT and there is ongoing project to install CCCTV in the port to monitor all movements. APM Terminal ensures adequate lighting during the night which helps in increasing the security standards in the Terminal. To note that the APM Terminal uses its own generators for electricity and is not linked to the national grid.

Security

ISPS Compliant
(Yes / No)

Yes

Current ISPS Level

1

Level 1 = Normal, Level 2 = Heightened, Level 3 = Exceptional

Police Boats

1

 

Fire Engines

No

 

 

 