2.2 Azerbaijan Aviation

2.2 Azerbaijan Aviation

Azerbaijan Aviation 

Azerbaijan Airports

Key airport information may also be found at: World Aero Data Information on Azerbaijan

In 1923, Azerbaijan established the Transcaucasian Civil Aviation Joint Stock Company “ZAKAVIA”, and on June 2, 1938, the first air group was established in Azerbaijan. This date in 2006, was declared Day of Civil Aviation of Azerbaijan according to relevant decree of the President of the Republic of Azerbaijan Ilham Aliyev.
Today eleven regions of the country are connected by air with Baku. Over the past 20 years in the country's civil aviation has been invested over 200 million USD. This allowed to provide its fleet with modern aircrafts «Boeing-757”, to modernize air navigation system, to establish the system of training for twenty respective specialties, built in Baku and put into commission a modern international airport serving the aircrafts of more than sixty airlines. Currently airports awarded international status have built in five regional centres of the country.
In Baku Cargo Terminal (BCT) which was completed in 2005, and operating as a transit point, has been provided with all the conditions for the receipt of goods shipped from west to east and from north to south. State organization in the management and regulation of civil aviation is the Civil Aviation Administration of Azerbaijan.

Civil Aviation: 

State Civil Aviation of Republic of Azerbaijan was established by the Decree № 512 of the President of the Republic Azerbaijan dated 29 December 2006 and is the central executive body, exercising control, state policy and regulation in the sphere of civil aviation. The total number of employees of the Administration is determined as 49 persons. Expenditures for maintenance and activities of the Administration are financed from the state budget of the Republic of Azerbaijan.
The Administration is headed by a director appointed and dismissed by the President of the Republic of Azerbaijan. Two Deputy Directors carry out their duties and have personal responsibility. From 2008 to 2013 Mr. Arif Mammadov successfully directed the activities of the Administration. Director of the State Civil Aviation Administration of the Republic of Azerbaijan from February 13, 2013 is Mr. Fuad Guliyev.

The administration consists of five departments:

  • Flight Safety Oversight Department;
  • Aviation Security Department;
  • Licensing and State Registry Department;
  • Foreign Relations Department;
  • Financial and Economic Department.

For information on Azerbaijan Civil Aviation, please see the following documents:

Azerbaijan Civil Aviation Board Information

Azerbaijan Civil Aviation Board Structure

For information on Azerbaijan Aviation contact details, please see the following link:

4.4 Azerbaijan Airport Company Contact List

2.2.1 Azerbaijan Baku Heydar Aliyev International Airport


Azerbaijan Baku Heydar Aliyev International Airport

 

Baku Heydar Aliyev international airport is one of the five international airports serving Azerbaijan.It serves approximately 1M of passengers a year. Its previous name was Bina international airport, named after a settlement near Baku. On 10 March 2004, it was renamed after Azerbaijan's nationwide leader Heydar Aliyev.
The airport is located 20 km northeast of the capital Baku and is linked to the city by two modern highways commissioned in 2008 and 2009.
It is the base hub of the Azerbaijan Hava Yollari national flag carrier.
Baku Heydar Aliyev international airport complies with international requirements. Due to its favorable geographical location, it has become a first-choice regional airport for transfer flights between East and West, North and South.

Location Details
Country Azerbaijan Latitude

40.462486

Province / District Baku Longitude 50.05039
Town or City (Closest)
16mls/25kms East of Baku
Elevation (ft and m) 10 ft / 3 m
Airfield Name Heydar Aliyev International Airport IATA and ICAO Codes IATA: GYD, ICAO: UBBB
Open From (hours) 24hrs Open To (hours) 24hrs

Runways

For more information on Runway 16, please see the following document:

Runway 16

Runway #16

Runway Dimensions

2700m x 60m

Orientation

160 South

Surface

ASPHALT

 

For more information on Runway 34, please see the following document:

Runway 34

Runway #34

Runway Dimensions

2700m x 60m

Orientation

340 North

Surface

ASPHALT


For more information on Runway 18, please see the following document:

Runway 18

Runway #18

Runway Dimensions

3200m x 51m

Orientation

180 South

Surface

CONCRETE & ASPHALT

 

 For more information on Runway 36 , please see the following document:

Runway 36

Runway #36

Runway Dimensions

3200m (Useable length 3065 m) x 51m

Orientation

360 North

Surface

CONCRETE & ASPHALT

Helicopter Pad(s)

Helipad #1

Present (Yes / No)

Yes

Largest helicopter that can land

Military MI-26 , Superpuma , Dolphin

Width and Length (metres)

n/a

Surface

n/a

Airport Infrastructure Details

Customs

Yes

JET A-1 fuel

Yes

Immigration

Yes

AVGAS 100

Yes

Terminal Building

Yes

Single Point Refueling

Yes

Passenger Terminal

Yes

Air Starter Units

Yes

Cargo terminal

Yes

Ground Power (mobile)

Yes

Pax transport to airfield

Yes

Ground Handling Services

Yes

Control Tower

Yes

Latrine Servicing

Yes

Weather Facilities

Yes

Fire Fighting Category (ICAO)

Yes

Catering Services

Yes

De-icing Equipment

Yes

Base Operating Room

Yes

Parking Ramp Lighting

Yes

Airport Radar

Yes

Approach & Runway Lights

Yes

NDB

Yes

VOR

Yes

ILS

Yes

 

 

Airport Operating Details

Operating Details
Maximum sized aircraft which can be offloaded on bulk cargo: IL76
Maximum sized aircraft that can be offloaded on pallet B767
Total aircraft parking area (m²) 15 aircraft parking
Storage Area (mt) 3000 SQM Cubic Meters (m³) n/a
Cargo Handling Equipment Available (Yes / No) yes If "Yes" specify below
Elevators / Hi Loaders (Yes / No) n/a Max Capacity (mt) n/a
Can elevators / hi loaders reach the upper level of a B747 (Yes / No) n/a
Loading Ramps (Yes / No)
  • 3 Units of higher loader
  • 8 units of loading conveyer
  • 6 units of forklift

Storage Facilities

Cargo Facilities : Capacity 3500 Tons
Passenger facilities : 50 Checks in desks , 8 gates , 4 air bridges , 3 baggage claim belts , post office , bank , exchange , restaurants , cafes , VIP and CIP lounges , duty free shop , car rental , taxi service , first aid , business center

Security

Level: Good

Companies Available 

For information on Azerbaijan Aviation Contact details, please see the following link:

4.4 Azerbaijan Airport Company Contact List

Information on some aviation service providers can be found at: AZ Freight Website Information on Azerbaijan Aviation