Indonesia
2.1.13 Indonesia Banten Port of Ciwandan and Merak
Home

 Port Overview

Link to port website: http://www.bantenport.co.id
NB
: The website relates only to Ciwandan Terminal (although Merak Mas is subject to the same regulations and port dues).

Located at the province of Banten, Port of Banten has become a transit destination and trading, both domestic and international.

  • The port, which is located at 10 km from the central city of Serang, was once an important harbor for international trade in the 15th century, of which vessels from Persia, the Middle East, China, England, and Portugal came to trade.

  • Today, the port serves an inland area that is experiencing rapid growth in the metal processing, mechanical, chemical and palm oil processing industries.

  • Banten Port boasts three coal terminals and a multipurpose dock with cargo-handling equipment that includes two rubber-tired gantry cranes and two multipurpose gantry cranes.

Port Contacts

Port Operating Company

PT Pelabuhan Indonesia II (Persero) / Indonesia Port Corporation (IPC)

Address: Jl. Raya Pelabuhan No. 1 Ciwandan, Cilegon 42166

Latitude

6°1'17.47" S

Longitude

105°57'17.94" E

Telephone

+62254601417

+62 8111 2501 11

Fax

+6225460n1419

Email

N/A

Web

http://www.bantenport.co.id/

 

Port Operations

Merak Mas Port of Banten

 

Latitude

5°55'14.09" S

Longitude

105°59'51.30" E

Contact

 General Manager

Mob

 

Telephone

+62254572007

+62254572008

Fax

+62254572922

Email

N/A

Web

http://merakmas-port.blogspot.co.id/

 

Port Customs

KPPBC Tipe Madya Pabean Merak

Address: Jl. Raya Pulorida No. 101, Merak 42438, Banten

Telephone

+62254571318

Fax

+62254571011

Email

kibcmerak@gmail.com

Web

http://www.bcmerak.net

  • Banten Port is managed by Indonesian Port Corporation (IPC), formerly known as Pelabuhan Indonesia (Pelindo) II.

  • There are 2 terminals approximately 20 Km apart.

  • Ciwandan Terminal is managed directly by IPC and handles bulk and multipurpose cargoes.

  • Merak Mas Terminal is operated by Sinarmas Group and handles containers and multipurpose cargoes.

Merak Mas Terminal

Port Performance

Liquid bulk and dry bulk cargo service dominate the stevedoring activity at Port of Banten. In 2013, the liquid bulk flow reached 835,358 tons, while dry bulk flow was 4,683,912 tons, particularly for coal commodity. In 2013, the realization of overseas trade goods flow was 2,799,492 tons, while domestic trade flow was 3,133,569 tons.

Discharge Rates

Refer to letter stating "Directors Decisions" PT Pelabuhan Indonesia II No. HK.56/2/3/PI.II - 2000.

Pilotage Services

  • Pilot services are available on call 24/7.

  • There are 2 pilot boats in the port MP.I-035 and MP.1-040, they are stationed in North Merak.

Tug Services

There are 6 tug boats in the port:

  • 2 units 1,600 HP

  • 2 units 2,400 HP

  • 2 units 3,200 HP

Hire of Labour and Equipment

Service (Per hour or part thereof)

Charge (indicate currency)

Floating Crane, incl. of minimum crew and exclusive of towage

Negotiated according to requirements

Mobile Crane more than 5 mt inclusive of driver

Negotiated according to requirements

Mobile Crane less than 5 mt or equal inclusive of driver

Negotiated according to requirements

VIP launch inclusive of crew

Negotiated according to requirements

Pilot boat inclusive of crew

Negotiated according to requirements

Fire appliance inclusive of minimum crew

Negotiated according to requirements

Tipper truck or flatbed lorry inclusive of driver

Negotiated according to requirements

Forklift or Tractor more than 5 mt inclusive of driver

Negotiated according to requirements

Forklift or Tractor less than 5 mt or equal of inclusive of driver

3 MT (Old Condition) Charges Negotiated

Van, Pick-up or Saloon Car inclusive of driver

Negotiated according to requirements

Management or supervisory staff

Negotiated according to requirements

Skilled staff: e.g. Crane or Forklift Driver, Artisan, Firemen or Clerk

Negotiated according to requirements

Semi-skilled staff: e.g. Labourers, Watchman

Negotiated according to requirements

Berthing Equipment & Specifications

Berthing Specifications

Total Berths

Quantity

Length (m)

Draft (m)

Ciwandan - Public Berth No. 1

1

122

10

Ciwandan - Coal Berth No. 2, 3, 7

3

218 (total)

7

Ciwandan - Multipurpose Berth No. 5

1

402

15

Ciwandan - Beaching Berth No. 6

1

10

3

Ciwandan - Bulk Liquid Berth No. 4

1

56

10

Merak Mas Container Berth No. 1 & 2

2

300

11

Merak Mas Conventional Berth No. 3-7

5

875

8-14

Berthing Tugs

6 Units

 

Pilot Boats

6 Units

Water Barges

Private

Police Boats

On Call

(Merak Coast Guard)

Mooring Boats

2 Units

Anti-pollution Boats

None

Speed Boats

Private


Port Handling Equipment

Port Cargo Equipment (Operational)

Appliances & Models 

Quantity

Capacity

Shore Gantry - Merak Mas

2

40 MT

Reach Stacker - Merak Mas

2

40 MT

Container Spreader

2

30 MT

Forklifts - Merak Mas

1

2 MT

Hooper - Merak Mas

3

5 MT

Multipurpose Crane - Ciwandan

2

35 MT

RoRo Tugmaster (with Trailer)

1

 

RTG - Ciwandan

2

10 BCH

Forklifts - Ciwandan

2

3 MT

Hooper - Ciwandan

4

 

Tractors

Private

NA

Trailers

Private

NA

Vacuvators)

Private

NA

Bagging Machines

None (cement)

NA

General Services

Service (Per day of part thereof)

Charge (indicate currency)

Bagging plant operators, per unit of plant

None

Vacuvators, per unit of plant

None

Bunker Supplier

Private Barge in Merak; charges are negotiated according to requirements.

Bunkering Agent

Charges negotiated according to requirements.

Barge operator, per barge

Charges negotiated according to requirements.

Fresh Water suppliers (road tankers)

Charges negotiated according to requirements.

Ship Contractors

Charges negotiated according to requirements.

Ship Chandlers

Charges negotiated according to requirements.

Safety equipment supplier & service

Available - Charges negotiated according to requirements.

Marine Contractors

Available - Charges negotiated according to requirements.

Scrap Metal Dealers

Charges negotiated according to requirements.

Ship Watchmen Supplier

Charges negotiated according to requirements.

Marine Engineer

Available - Charges negotiated according to requirements.

Marine Surveyor

Available - Charges negotiated according to requirements.

Ship Surveyor

Available - Charges negotiated according to requirements.

Cargo Surveyor

Available - Charges negotiated according to requirements.

Sludge Collector

Charges negotiated according to requirements.

Small Boat Operator

Charges negotiated according to requirements.

Stevedoring- Ciwandan


Port Security

Banten Port has been awarded ISPS level 1 in 2004

Security

ISPS Compliant

Yes

ISPS Level (current)

1=Normal

Police Boats

YES

Fire Engines

YES

Storage Facilities

  1. 1.   Port Storage - Ciwandan

Total Floor Space = m²

Quantity

Floor Area (m²)

Open Yard

1

4.2 Ha

Container Yard

1

4.1 Ha

Warehousing

3

8000 m²

 

Port Storage - Merak Mas

Total Floor Space = m²

Quantity

Floor Area (m²)

Open Yard

1

78,000 m²

Container Yard

1

41,000 m²

Warehousing

1

8,000 m²


Jump to top